top of page

Primavera P6 Schedule Health Assessment – DCMA 14-Point (Excel Dashboard)

Premium

A ready-to-use DCMA 14-Point Schedule Health Assessment toolkit that helps planners, PMOs, and project controls teams objectively evaluate Primavera P6 schedules, identify compliance gaps, and improve schedule quality—with an instant, visual dashboard.

$

2

A schedule that “looks fine” is not always a healthy schedule.


The PMO Champion Primavera P6 DCMA 14-Point Assessment Template enables you to measure schedule quality objectively using the globally recognized DCMA 14-Point metrics—the same standards used in defense, EPC, infrastructure, and large enterprise programs.


Instead of manually checking each rule inside Primavera P6, this template allows you to:

  • Import P6 schedule data into Excel

  • Automatically assess all 14 DCMA metrics

  • Instantly see overall schedule health

  • Identify exactly where corrections are required

The included free visual dashboard converts complex schedule diagnostics into clear health indicators—making it ideal for PMO governance, audits, and leadership reviews.



What’s Included in This Template


📋 DCMA 14-Point Assessment Engine (Excel)

Automatically evaluates schedule compliance across:

  • Logic & relationships

  • Leads & lags

  • Constraints

  • High/negative float

  • Missing predecessors/successors

  • Invalid dates

  • Resources & durations

  • Schedule realism indicators


📊 Free Schedule Health Dashboard

  • Overall schedule health score

  • Pass / fail visibility for each DCMA metric

  • Color-coded indicators (Green / Amber / Red)

  • Leadership-friendly, audit-ready visuals


⚙️ P6-Friendly Data Import

  • Copy-paste Primavera P6 data into Excel

  • Minimal cleanup required

  • No macros, no plugins, no tools


Key Features & Benefits


✔️ Objective Schedule Quality Measurement – No subjective judgment
✔️ DCMA-Aligned – Industry-recognized best practices
✔️ Instant Health Score – See issues immediately
✔️ PMO & Audit Ready – Ideal for compliance reviews
✔️ Excel-Based & Lightweight – No P6 customization required



Who Should Use This?

  • Primavera P6 Planners & Schedulers

  • Project Controls & Planning Engineers

  • PMOs governing complex schedules

  • EPC, Infrastructure & Defense projects

  • Consultants performing schedule audits

PMOCHAMPION-HD-CROPPED.png
bottom of page